- List your property - it's free
- 등록 또는 로그인합니다.
-
한국어- ko
-
KRW - ₩
이 부동산은 매물 사용 가능한 및 3 화장실들가 포함된 빌라입니다.. 이 빌라을 ₩289,000,000(₩1,870,000/제곱미터입니다)의 기본 가격으로 구입할 수 있습니다.
Foreign nationals can own the building (빌라) in their own name, but not the land that it stands on.
Foreign nationals cannot own land in Thailand. The options in which a foreigner can control the land are via a 30-year lease or by purchasing the land through a Thai company.
The building (the bricks and mortar) can be owned by a non-Thai national outright in their name in what is called the house registry, which secures ownership indefinitely of the structure.
In Thailand, non-Thai nationals cannot own land outright in their name. Land can be controlled through either a Thai Company or a long-term registered lease. The longest registered lease term by Thai law is 30 years, and most developers will offer 3 terms for a total of 90 years.
A 30-year lease period is legally protected under Thai law and ownership cannot be disrupted. It is common for developers to offer an additional two terms of 30 contractually obligating a total of 90 years.
Prior to purchasing a leasehold property, it is important to secure a copy of the lease agreement or get further clarity on these three points:
After you have found the right property at Golden Pool Villas (Phase 1) you have to follow these steps:
Golden Pool Villas (Phase 1) 할부입니다 마일스톤입니다 지불 1회차 Signing of the contract for the construction work. 30% 2회차 When the list below completed. 2.1 Footing & stud column structure completed 2.2 Lower floor structure completed 2.3 2nd. floor structure completed 2.4 Roof Steel structure completed 19% 3회차 When the list below completed. 3.1 Roof finishes completed 3.2 Walls masonry completed 3.3 Walls cement render completed 3.4 Wall Finishes completed 3.5 Ceiling Finishes completed 20% 4회차 When the list below completed. 4.1 Floor Finishes completed 4.2 Doors & windows completed 4.3 Sanitary ware completed 4.4 Painting completed 18% 5회차 When the list below completed. 5.1 Last inspection of the house 5.2 Handover 10% Golden Pool Villas (Phase 1) 할부입니다 마일스톤입니다 지불 1회차 Signing of the contract for the construction work. 30% 2회차 When the list below completed. 2.1 Footing & stud column structure completed 2.2 Lower floor structure completed 2.3 2nd. floor structure completed 2.4 Roof Steel structure completed 20% 3회차 When the list below completed. 3.1 Roof finishes completed 3.2 Walls masonry completed 3.3 Walls cement render completed 3.4 Wall Finishes completed 3.5 Ceiling Finishes completed 19% 4회차 When the list below completed. 4.1 Floor Finishes completed 4.2 Doors & windows completed 4.3 Sanitary ware completed 4.4 Painting completed 20% 5회차 When the list below completed. 5.1 Last inspection of the house 5.2 Handover 10% Golden Pool Villas (Phase 1) 할부입니다 마일스톤입니다 지불 1회차 Signing of the contract for the construction work. 30% 2회차 When the list below completed. 2.1 Footing & stud column structure completed 2.2 Lower floor structure completed 2.3 2nd. floor structure completed 2.4 Roof Steel structure completed 20% 3회차 When the list below completed. 3.1 Roof finishes completed 3.2 Walls masonry completed 3.3 Walls cement render completed 3.4 Wall Finishes completed 3.5 Ceiling Finishes completed 20% 4회차 When the list below completed. 4.1 Floor Finishes completed 4.2 Doors & windows completed 4.3 Sanitary ware completed 4.4 Painting completed 20% 5회차 When the list below completed. 5.1 Last inspection of the house 5.2 Handover 10%